    A transfer switch is the code-required piece that lets a generator safely power your home without back-feeding the utility line. CAS Electric installs manual (interlock and rotary) and automatic transfer switches across Franklin County and the Greater St. Louis area — Pacific, Washington, Union, Sullivan, St. Clair, Eureka, Wildwood, Villa Ridge, and Marthasville. This page breaks down real installed costs, the differences between manual and automatic switches, permit requirements, and what to expect on install day.

    About Generator Transfer Switch Installation

    A generator transfer switch is what makes generator power legal, safe, and code-compliant. Plugging a portable generator into a wall outlet — or running extension cords through a window — is not just unsafe, it can back-feed the utility line and electrocute a lineman working to restore power. A transfer switch physically isolates your home's circuits from the utility before generator power is applied, so only one power source is ever connected at a time.

    There are three common styles in Franklin County and St. Louis homes. A generator interlock kit is the most affordable — a mechanical plate installed on your existing panel that blocks the main breaker and a generator inlet breaker from being on at the same time. A manual transfer switch is a separate small sub-panel with 6–10 selectable circuits you flip over during an outage. An automatic transfer switch (ATS) senses utility loss, starts a standby generator, and transfers the load in about 10 seconds — no one has to be home.

    Installed cost depends on the switch type, amperage, whether a critical-loads sub-panel is added, and how far the generator inlet or generator itself sits from the panel. We give a flat written quote up front. CAS Electric pulls the electrical permit, coordinates with Ameren when a disconnect is required, and commissions the switch with a simulated outage before we leave.

    Why Choose Transfer Switch from CAS Electric

    Code-compliant, permitted, and inspected — no back-feed risk
    Options for every budget: interlock kits, manual sub-panels, or automatic transfer switches
    Flat written installed price — no hourly surprises
    Works with portable generators, inverter generators, and standby units
    Compatible with Generac, Kohler, Briggs & Stratton, Honda, Champion, and Predator
    Ameren disconnect/reconnect handled when required
    Commissioned with a simulated outage before we leave the job

    Our Process

    Transfer switch pricing depends on the switch type (interlock kit, manual, or automatic), amperage, distance from the panel, and whether a critical-loads sub-panel is added. Every quote is flat and written — contact us for a free estimate. No hourly billing.

    1. 1

      Free on-site estimate

      We look at your panel, generator (or planned generator), and inlet location, then give you a flat written price with the switch type and installed cost broken out.

    2. 2

      Permit & scheduling

      We pull the electrical permit, coordinate Ameren if a service disconnect is needed, and schedule the install at your convenience.

    3. 3

      Install in one day (most jobs)

      Interlock kits and manual transfer switches are typically a same-day install. Automatic transfer switches paired with a new standby generator can take 1–2 days.

    4. 4

      Commissioning & inspection

      We run a simulated outage to verify the switch transfers correctly and the generator starts, stabilizes, and carries the load. Inspector signs off and you get a labeled switch and quick-start guide.

    Why Choose CAS Electric

    • 17 years of electrical experience across Missouri residential and commercial
    • Licensed, insured, and owner-operated — the electrician who quotes is the one who installs
    • Flat written pricing before any work starts — no hourly meter
    • First-time inspection pass on virtually every job
    • Local to Franklin County — real availability, real response times

    Frequently Asked Questions

    How much does a generator transfer switch installation cost?+

    Installed cost depends on the transfer switch type (interlock kit on your existing panel, manual switch with a small critical-loads sub-panel, or automatic transfer switch), amperage, distance from the panel, and whether a critical-loads sub-panel is added. Full standby generator + ATS packages are quoted as a bundle. We provide a free written estimate scoped to your setup — no hourly billing.

    What's the difference between a manual and an automatic transfer switch?+

    A manual transfer switch (or interlock kit) requires you to be home during an outage — you shut off your main breaker and flip the transfer switch to generator power. An automatic transfer switch (ATS) is paired with a standby generator and does everything for you: it senses utility loss, starts the generator, transfers the load in about 10 seconds, and transfers back when utility power returns. Manual is cheaper up front; automatic is convenient and works when you're away.

    Is a generator interlock kit as good as a transfer switch?+

    Yes, when installed correctly and permitted. A generator interlock kit is a listed, code-compliant option that mechanically prevents your main breaker and generator inlet breaker from being on simultaneously. It's the most affordable path to safe, legal generator power for a portable unit. The trade-off vs. a manual transfer switch is that you're using your existing panel's breakers to pick which circuits run on generator power, rather than a dedicated sub-panel with pre-selected circuits.

    Do I need a permit to install a generator transfer switch in Missouri?+

    Yes — every Franklin County and St. Louis-area jurisdiction requires an electrical permit and inspection for transfer switch installations, whether it's an interlock kit, a manual switch, or an ATS. We pull the permit, schedule the inspection, and handle Ameren coordination when a service disconnect is required.

    How long does it take to install a transfer switch?+

    Most generator interlock kits and manual transfer switches are a single-day install — usually 3–6 hours on site including panel work and inlet mounting. Standalone automatic transfer switches for an existing generator are typically a one-day job. A full new standby generator + ATS install runs 1–2 days on the electrical side, plus a separate visit from a licensed plumber for the gas line.

    What size transfer switch do I need for my generator?+

    The transfer switch amperage should match (or exceed) your generator's output and your intended load. Typical portable generator setups use 30-amp or 50-amp switches. Standby generators for whole-home coverage typically pair with a 200-amp service-entrance ATS. During the estimate we look at your generator nameplate and the circuits you want covered, then size the switch accordingly.

    Can I install a transfer switch myself?+

    It's not legal in Missouri to install a permanent transfer switch without a licensed electrician pulling the permit and having the work inspected. Beyond the legal side, a mis-wired transfer switch can back-feed the utility line and injure or kill a lineman, or destroy the generator when utility power returns. This is the exact scenario transfer switches exist to prevent — it needs to be done by someone licensed and inspected.

    Will a transfer switch work with any brand of generator?+

    Manual transfer switches and interlock kits are generator-agnostic — they'll work with any brand of portable or inverter generator with a matching outlet (typically L14-30 or CS6375). Automatic transfer switches need to be compatible with the generator's start signal; most modern standby generators from Generac, Kohler, Briggs & Stratton, and Cummins have compatible ATS options and we'll spec accordingly.

    Get a Free Transfer Switch Estimate

    Licensed, insured, owner-operated. We respond to all estimates within 1 business day.