Specialty · Franklin County & St. Louis, MO

    Automatic Transfer Switch Installation in Franklin County & St. Louis, MO | CAS Electric

    An automatic transfer switch (ATS) is what makes a standby generator actually automatic — it senses utility loss, starts the generator, transfers the load, and transfers back when utility power returns. CAS Electric installs and replaces ATS units across Franklin County and the Greater St. Louis area — Pacific, Washington, Union, Sullivan, St. Clair, Eureka, Wildwood, Villa Ridge, and Marthasville.

    About Automatic Transfer Switches

    There are two main types of automatic transfer switches for residential and small commercial: service-entrance rated (SE-ATS), which sits between the meter and the panel and transfers your entire service, and load-side ATS, which sits between the main panel and a critical-loads sub-panel and only transfers a curated set of essential circuits.

    Service-entrance ATS is the right choice for whole-home coverage when the generator is sized to run everything. It's simpler in some ways (no load-shedding logic) and gives you your whole house on backup power. Load-side ATS is the right choice when you want backup on essentials only — furnace, sump, fridge, some lights, maybe one A/C — and want to spec a smaller (cheaper) generator.

    We install both types, coordinate the panel work (sometimes a new critical-loads sub-panel is part of the scope), and commission the ATS with simulated utility failures to verify transfer timing and correct behavior on return-to-utility. All work is permitted and inspected.

    Why Choose Transfer Switch from CAS Electric

    Fully automatic — no manual switching, no interlock kits
    Utility-safe — prevents backfeed to Ameren lines
    Service-entrance or load-side options based on your setup
    Return-to-utility timing tuned to prevent nuisance transfers
    Compatible with Generac, Kohler, Briggs & Stratton, Cummins
    Permit and inspection handled

    Our Process

    ATS install pricing depends on ATS type (service-entrance vs load-side), amperage, and whether a critical-loads sub-panel is part of scope. Full generator + ATS installs are quoted as a package. We provide a free written estimate.

    1. 1

      System scoping

      We determine whether service-entrance or load-side ATS is the right fit and size the switch to your service.

    2. 2

      Written flat-rate quote

      Includes ATS, any critical-loads sub-panel, wiring, permit, and inspection coordination.

    3. 3

      Install & commissioning

      ATS mounted, wired between utility and panel, tied to generator start signal, and commissioned with simulated utility failures.

    4. 4

      Inspection & handoff

      Local inspector signs off, we walk you through the ATS status indicators and manual override procedure.

    Why Choose CAS Electric

    • Service-entrance and load-side ATS install experience
    • All major generator brand compatibility
    • Proper commissioning with simulated utility failures
    • Critical-loads sub-panel design when scope calls for it
    • Permit and inspection handled

    Frequently Asked Questions

    What's the difference between an ATS and an interlock kit?+

    An ATS transfers automatically without you touching anything. An interlock kit is a mechanical safety device that lets you manually flip your main breaker off and a generator inlet breaker on. Interlocks are cheaper but require you to be home during an outage to switch over.

    Do I need a critical-loads sub-panel?+

    Only with a load-side ATS. Service-entrance ATS transfers your whole house so no sub-panel is needed. Load-side ATS uses a separate critical-loads panel with just the circuits you want to keep running during an outage.

    Can I add an ATS to an existing generator?+

    Depends on the generator. Manual-transfer-only generators can't be upgraded to automatic without changes on the generator side. Standby generators from Generac, Kohler, etc. that were installed with a manual switch can often be converted by swapping the manual switch for a compatible ATS.

    How long does an ATS install take?+

    Usually one day for the electrical work — pad, ATS mount, wiring between meter/panel and generator, commissioning. Inspection is scheduled for the same or next day.

    Do you install ATS units for portable generators too?+

    Portable generators typically use manual transfer switches or interlock kits rather than automatic transfer switches. We install both — but true automatic transfer requires a standby generator.